Planning Adjustment for the New Rural Residential Area Combined with Eco-Tourism, Resort, and Sports Services in Tu Vu and Cu Dong

On the afternoon of November 17, Comrade Vu Viet Van — Member of the Standing Committee of the Provincial Party Committee and Vice Chairman of the Provincial People’s Committee — heard the Department of Construction and relevant units report on the local adjustment of the 1/2,000 scale construction zone plan for the New Rural Residential Area Combined with Eco-Tourism, Resort, and Sports Services in the former Thanh Thuy and Thanh Son districts, now belonging to Tu Vu commune and Cu Dong commune.

Planning Adjustment for the New Rural Residential Area Combined with Eco-Tourism, Resort, and Sports Services in Tu Vu and Cu Dong

Vice Chairman of the Provincial People’s Committee Vu Viet Van speaking at the conference.

According to the report, the approved scheme has a total area of 266.58 hectares and a population scale of approximately 8,020 people. The proposed adjustment scope covers the entirety of Sub-zone A, spanning 69.32 hectares; of which approximately 50 hectares belong to Tu Vu commune and the remaining 19.32 hectares belong to Cu Dong commune. Sub-zone B, covering 197.26 hectares, remains unchanged in accordance with the approved plan. The project has an operational term of 50 years and is expected to complete construction and acceptance in Q4/2030.

Planning Adjustment for the New Rural Residential Area Combined with Eco-Tourism, Resort, and Sports Services in Tu Vu and Cu Dong

Leadership of the Department of Construction reporting at the conference.

The adjustment plan focuses on rearranging the positions and boundaries of land plots; distributing educational, cultural, green space, and parking works more appropriately; and retaining existing residential housing to the maximum extent. Lakes and canals are preserved according to natural terrain and water flows to improve drainage and limit leveling. The consulting unit coordinated with the two communes to gather opinions from the residential community as a basis for finalizing the plan.

Planning Adjustment for the New Rural Residential Area Combined with Eco-Tourism, Resort, and Sports Services in Tu Vu and Cu Dong

Overview of the conference.

Delivering concluding remarks at the conference, Vice Chairman of the Provincial People’s Committee Vu Viet Van requested the Department of Construction to absorb comments from departments and sectors and review legal bases, ensuring the adjustment plan aligns with master planning, urban development orientations, and the exploitation and usage needs of both the investor and citizens.

Among these, it is necessary to clarify connection plans for transport, power supply, water supply and drainage, and wastewater treatment; determine the location, scale, and infrastructure of the resettlement area for citizens; and formulate handling options for cemetery land areas within the project scope.

He proposed that relevant agencies coordinate to review each adjusted location, especially contents regarding green spaces and connectivity with major projects currently underway; finalize dossiers in accordance with regulations, and report to the Provincial People’s Committee.

Minh Thuat – Ngoc Nguyen


Minh Thuat – Ngoc Nguyen

 {name} - {time}
{body}
 {name} - {time}
{body}

0 comment

Your comments will be edited before posting. Please type the accented Vietnamese.

Read more

More

Suggest

Popular

Weather

POWERED BY
Việt Long